Short research framing for dynamic security, TSA, and CCT in my work. Teaching chapters, figures, and labs live in SciML for PS. Programme overviews are on the Research page.
Assessment concepts
In my research, dynamic security is the operational question after a disturbance: does the grid stay stable, and is a margin such as CCT still adequate? TSA and CCT are the assessment tools I use most for that question.
Dynamic security
In power systems, dynamic security is the ability of the grid, in its present operating condition, to remain stable after credible disturbances such as short circuits. It is assessed by checking whether generators and converters keep synchronism and whether a stability margin (for example CCT) remains adequate.
In the IEEE/CIGRE framework, the transient rotor-angle branch is where my TSA/CCT focus sits; converter-driven stability matters increasingly in renewables-rich grids. Teaching detail (classification tree, SMIB cases, CCT diagrams) is in SciML for PS, not duplicated here.
TSA asks whether synchronism is kept after a disturbance. CCT is one operational margin: how long can a fault remain before stability is lost.
Teaching depth: SciML for PS
IEEE/CIGRE placement, TSA cases, CCT margins, and labs live in the living teaching book. This page stays a short research framing only.
Short visual summaries of the three research programmes. For problem statements, methods, and selected work, see Research.
Conventional machines are assessed with synchronizing torque among generators. Converter-connected plants are not the same device: grid-following (GFL) and grid-forming (GFM) need different models. Direct energy functions give a CCT for the GFM unit when a GFL converter is in parallel, without waiting for a long time-domain sweep.Scientific AI here is a surrogate for post-fault trajectories, not a classifier that only says stable or unstable. Time-domain simulation remains the teacher. The physics-informed neural network (PINN) is queried many times for planning-oriented TSA and CCT studies when repeating full simulation would be too slow.The twin is the operating-point loop I am building toward. Measurements refresh the model; stability theory says which margins matter; the surrogate makes those margins cheap enough to ask often. It is not a visualisation of substations.